St Peters Terrace
Fulham
Project duration: 28 weeks
Project overview: An architecturally led project (Granit Architects) which we won at tender. The house required fully stripping out, extending at lower ground level and in the loft and the internal layout remodelled. From site set up and demolition, through to completion and handover, the project ran to programme and on schedule.